Planning a Home Extension or Alteration: What to Check First
Most extensions and alterations that run into trouble do so for reasons that could have been spotted before any drawings were done. Common examples are a planning restriction nobody checked, a drain running under the new footprint, a wall that turned out to be holding up the floor above, or quotes that couldn’t be compared because each builder priced something different.
This guide sets out what to check, and roughly in what order, before you commit to an extension, loft conversion, knock-through or other alteration to a house. It is written for homeowners in England, with notes for Chichester, West Sussex and Hampshire.
The rules depend on the individual property, its location, its planning history and the exact proposal. Use this guide to ask the right questions, not as a substitute for advice on your own project or confirmation from the council.
About RK Building Design
RK Building Design is Richard Knapp’s building design practice, based in Southampton and separate from Kenny Relf Surveyors. Richard turns ideas for extensions and alterations into practical designs and drawings. His work runs from a measured survey of the existing house through to planning drawings, Building Regulations drawings and tender documents for builders.
If you already know you need drawings, you can read more about RK Building Design or contact Richard using the form at the end of this guide. If you are still at the early stages, the checks below are worth working through first.
Quick answers
Do I need planning permission for an extension? Not always. Many single-storey rear extensions, and some loft conversions, on houses can be built under permitted development rights without a planning application, as long as they meet detailed limits and conditions. Flats and maisonettes do not have these householder rights. The rights are reduced in conservation areas, National Parks and National Landscapes, and they can be removed altogether by the council or by a condition on an earlier planning permission.
Is Building Regulations approval the same as planning permission? No. Planning decides whether a development is acceptable: its size, appearance and effect on neighbours and the area. Building Regulations control how it is built: structure, fire safety, insulation, ventilation and drainage. Most extensions need Building Regulations approval even when they don’t need planning permission.
When do I need drawings? For a planning application, for Building Regulations approval of most extensions, and for builders to price the work properly. A small internal alteration may only need a structural engineer’s calculations and a clear description, but anything that changes the outside of the house will normally need proper drawings.
Do I need a structural engineer? Usually, if you are removing or altering a load-bearing wall or chimney breast, converting a loft, adding a storey or putting new loads on the existing structure. Building Control will normally expect calculations for new beams and their supports.
Does the Party Wall Act apply to me? It can, if you are working on a wall shared with a neighbour, building a new wall on the boundary line, or digging foundations close to a neighbouring building. It is separate from both planning and Building Regulations.
Start with what you want the project to achieve
Before thinking about size or shape, write down what isn’t working in the house now. For example:
- The kitchen is too small to eat in.
- There is no downstairs toilet.
- You need a room to work from home.
- The back of the house is dark.
- The family is growing and you need another bedroom.
Then separate what the finished house must do from what would be nice to have. Think about how long you plan to stay, as that affects how much it makes sense to spend.
Extra floor area does not automatically fix a layout. A rear extension can leave the middle of the house darker, turn the old kitchen into a corridor or remove the only window to another room. Sometimes reorganising the existing space, or a smaller extension in the right place, does more for less money.
Set a realistic overall budget
The building work is only part of the cost. A realistic budget usually also includes:
- Design and drawing fees
- Structural engineer’s fees
- Planning application and Building Control fees
- Party wall surveyors’ costs, if the Party Wall Act applies
- Water company fees, if you are building over or near a public sewer
- Kitchen, bathroom, flooring and decoration, if not in the builder’s price
- VAT, where it applies
- A contingency for things that only come to light once work starts, which is more likely in an older house
Check the planning position before you design
Planning constraints should shape the design from the start. Finding them after the drawings are done usually means paying for a redesign.
Things to find out about your property:
- Is it a house, or a flat or maisonette? Householder permitted development rights only apply to houses.
- Is it in a conservation area, a National Park or a National Landscape (formerly an Area of Outstanding Natural Beauty)?
- Is it listed, or within the grounds of a listed building?
- Has the council made an Article 4 direction removing some permitted development rights in your area?
- Did an earlier planning permission remove permitted development rights? This is common on newer estates, where the original permission for the houses includes such a condition.
- Has the house already been extended? Permitted development limits are measured against the house as originally built (or as it stood on 1 July 1948 if it is older). Earlier extensions, including by previous owners, use up some of the allowance.
- Are there protected trees on or near the property?
- Is the property in a flood risk area? A planning application may then need a flood risk assessment.
- Are there restrictive covenants in the title deeds? A covenant is a private legal restriction, separate from planning. It can limit extensions even where planning allows them.
The council’s planning pages usually have maps of conservation areas and other constraints, and a search of past planning applications for your address.
Who is the planning authority around Chichester and Hampshire?
- Chichester district: Chichester District Council for most of the district.
- Inside the South Downs National Park: the South Downs National Park Authority is the planning authority. In the Chichester area, Chichester District Council handles many National Park householder applications on the Authority’s behalf, but the National Park’s planning policies apply.
- Chichester Harbour: the harbour and its surroundings are a National Landscape, where some permitted development rights are more limited.
- Hampshire: your district, borough or city council (for example Havant, East Hampshire, Fareham, Portsmouth or Winchester), or the South Downs National Park Authority if the property is in the Park, as around Petersfield is.
If you are not sure which council covers your address, use GOV.UK’s find your local council service.
If you need a planning application
A householder planning application normally needs a location plan, a site plan, and existing and proposed floor plans and elevations. Some sites need more, such as a heritage statement, tree information or a flood risk assessment.
The council consults neighbours. It normally aims to decide householder applications within eight weeks of receiving a valid application. Many councils offer paid pre-application advice, which can be worth having on a sensitive site.
Read the decision notice carefully. Permissions usually have to be started within three years, and conditions can require approval of details such as materials before work begins.
Could the work be permitted development?
Permitted development rights are a national planning permission for certain types of work to houses, so no planning application is needed. They cover, among other things, some rear and side extensions, roof extensions such as dormers, porches and garden outbuildings.
Each type of work has its own limits on size, height, position in relation to the boundaries and the road, and materials. These are more detailed than most summaries suggest. Small details, such as the eaves height close to a boundary or how far a side extension projects, can take a proposal outside them.
Points that often catch people out:
- Houses only. Flats and maisonettes do not have householder permitted development rights.
- Designated land. In conservation areas, National Parks and National Landscapes the rights are reduced. For example, side extensions and dormer roof extensions are not permitted development there.
- Rights can be removed, by an Article 4 direction or by a condition on an earlier planning permission.
- Earlier extensions count, because limits are measured from the original house.
- Prior approval. Some larger single-storey rear extensions need the council’s prior approval, including a neighbour consultation, before work starts.
- Materials. These generally need to be similar in appearance to the existing house.
- Planning only. Permitted development does not cover Building Regulations, listed building consent or the Party Wall Act.
The government’s technical guidance on permitted development for householders sets out the limits with diagrams. The Planning Portal has a plain-English overview of permitted development rights and of extensions.
Getting certainty: a Lawful Development Certificate
If you believe a project is permitted development, you can apply to the council for a Lawful Development Certificate. It is optional, but it confirms that the proposal is lawful. It is useful if the case is borderline, and as evidence for a buyer’s solicitor when you eventually sell.
Planning permission and Building Regulations are not the same thing
This is one of the most common points of confusion. They are two separate systems, often run by different people, and a project may need one, both or neither.
| Planning permission | Building Regulations approval | |
|---|---|---|
| What it covers | Whether the development is acceptable: size, appearance, use and effect on neighbours and the area | How the work is designed and built: structure, fire safety, insulation, ventilation, drainage, electrics and access |
| Who deals with it | The local planning authority (the district council or the National Park Authority) | Local authority building control, or a registered building control approver |
| Typically needed for | Development that is not permitted development | Most extensions, loft conversions, structural alterations and new drainage, even where no planning permission is needed |
| What you receive | A decision notice (or a Lawful Development Certificate) | A completion certificate, or a certificate from a registered competent person for work such as electrics or a new boiler |
Listed building consent and the Party Wall Act are separate again, and are covered below.
How Building Regulations approval works
For an extension, the usual route is a full plans application. Building Control checks the drawings and specification before work starts and then inspects at key stages, such as foundations, drainage and insulation. Resolving problems on paper is much cheaper than on site, and builders can price from approved information.
A building notice lets work start without plans approval, with compliance checked during inspections. It can suit simpler jobs, but it is not available for every type of work. For anything substantial it shifts the risk of a problem onto the build itself.
Some work can be self-certified by installers registered with a competent person scheme, such as electricians, gas engineers and window installers.
When the work is finished, keep the completion certificate. A buyer’s solicitor is very likely to ask for it when you sell.
Replacing a conservatory roof with a solid roof, or removing the doors between a conservatory and the house, will usually bring it within the Building Regulations. Check this before you commit.
The government publishes the technical requirements as Approved Documents. GOV.UK has a summary of when you need Building Regulations approval. We also cover the basics in our article on building control applications.
Understand the existing building first
An extension or alteration has to work with the building that is already there. Most expensive surprises come from the existing house, not from the new part.
How the house is built
Many houses built before the 1920s and 1930s have solid walls rather than cavity walls, shallow foundations, and lime mortar and render rather than cement. These materials let moisture evaporate. Cement renders, impermeable paints or a badly detailed junction with a new extension can trap moisture and cause damp in a wall that was previously fine.
Where new meets old, the two parts usually settle differently. Designs often include a movement joint, and foundations for the extension are normally deeper than the old footings beside them.
Details at the junction
The junction between the old house and the extension is where problems often start. Check these points:
- Air bricks: many houses have suspended timber ground floors ventilated by air bricks. An extension built against that wall can block them unless ventilation is carried through, which can lead to timber decay.
- Damp-proof course: new paths, patios or floor levels set too high can bridge the damp-proof course.
- Roof and rainwater: you need a sensible way to join the roofs, and somewhere for the extra rainwater to go.
- Floor levels: a step between old and new floors is easy to design out on paper and awkward to fix on site.
The condition of the house
Damp, cracking, roof problems, decayed timbers and leaking drains are better found before you build than during. An alteration can make an existing defect more expensive to put right. It can also lead to an argument with your builder about who caused what.
If the house is older, has been altered before, or you already have concerns, it can be worth having the existing building inspected first. Our Level 3 Building Survey suits older and altered homes. For a specific concern, such as a crack or a damp wall, a single defect report is more proportionate. We also carry out damp and mould investigations.
Previous work and hidden hazards
- Undocumented previous work. A wall removed or a loft converted without approval may need investigating before further work is signed off. Gather any approvals and completion certificates you have.
- Trussed rafter roofs. Most modern roofs use factory-made trussed rafters. They must not be cut or altered without an engineer’s design, which matters for loft conversions and roof alterations.
- Asbestos. Houses built or refurbished before 2000 may contain asbestos, for example in textured ceilings, floor tiles, boarding or roofing. Have suspect materials checked before they are disturbed.
- Bats and nesting birds. Bats and their roosts are protected by law. If roof work is planned and there are signs of bats, a bat survey may be needed before work goes ahead.
Structural alterations and removing walls
Knocking two rooms together or opening the back of the house into an extension is one of the most common alterations. It is also the one most often underestimated.
You cannot reliably tell whether a wall is load-bearing by tapping it. Clues include:
- floor joists resting on it;
- walls directly above it on the floor above;
- roof loads coming down through it;
- a chimney breast.
In older houses even timber stud walls can carry load.
Removing or altering a load-bearing wall:
- needs Building Regulations approval;
- usually needs a structural engineer’s calculations, for the new beam, its bearings and padstones, and to check that the walls and foundations below can carry the concentrated loads at each end;
- needs temporary support while the wall is taken out;
- may need fire protection to the new steel beam.
Removing a chimney breast leaves the chimney above needing support. If the chimney is shared with a neighbour, the Party Wall Act will usually apply.
When an engineer is, and isn’t, needed
You will normally need structural engineering input for:
- removing load-bearing walls or forming large openings in them;
- loft conversions;
- adding a storey;
- new beams;
- extensions on poor ground, or close to trees on shrinkable clay soils, where foundations may need to be deeper.
You will not usually need one for:
- taking out a non-load-bearing partition;
- like-for-like repairs;
- most purely cosmetic work.
Drainage and services
Drainage is one of the most common causes of redesign and extra cost, because it is underground and easy to forget.
Find the drains before you design
Lift the inspection chamber (manhole) covers and work out which way the drains run and how deep they are. In many houses the drains run across the back garden exactly where an extension would go.
Since October 2011, most drains shared with neighbours and the sewers they connect to have belonged to the water company. A shared drain in your garden may therefore be a public sewer, even if it isn’t shown on any plan.
Around Chichester and much of Hampshire the sewerage company is Southern Water. Building within 3 metres of a public sewer needs its approval through a build-over application. Building over manholes and some pipes is not usually accepted, which can mean moving a manhole, diverting the drain or changing the design. If you are elsewhere, check with your own water company.
If the drains are old, there are signs of problems, or the extension will sit over or beside them, a CCTV drainage survey before the design is finalised is often money well spent.
Rainwater, kitchens and bathrooms
- Rainwater: a new roof needs somewhere for its water to go. Soakaways need to be well away from buildings; the Building Regulations guidance generally expects at least 5 metres.
- Kitchens and bathrooms: waste pipes need enough fall to drain, so the position of the soil stack often decides where a new bathroom or kitchen can go. New kitchens and bathrooms also need mechanical extract ventilation.
Gas, heating and electrics
- Boiler flue and gas meter: an extension can leave a boiler flue too close to a new window or wall, or enclose an external gas meter. Either may need moving.
- Heating: check whether the existing boiler or heat pump and pipework can serve the extra space.
- Electrics: new circuits are notifiable work, so use a registered electrician. Older wiring or consumer units may need upgrading.
Light, ventilation and energy efficiency
An extension can cut off the window that lights and ventilates an existing room. That room still needs adequate daylight and ventilation, and the design has to provide it.
New walls, roofs, floors and windows must meet current energy efficiency standards. Extensions with a lot of glazing may need calculations to show they comply.
Neighbours, boundaries and the Party Wall Act
Boundaries and access
- Check where the boundary actually is. Land Registry title plans normally show general boundaries only, not the exact line.
- Keep everything on your side. Foundations, gutters, eaves and other overhangs should not cross onto a neighbour’s land without their agreement.
- Think about access. If scaffolding or building work will need access from next door, agree it in advance.
- Talk to your neighbours early. They will be told about a planning application anyway. Hearing about it from you first usually goes better.
When the Party Wall etc. Act 1996 applies
The Party Wall etc. Act 1996 applies in England and Wales. It is separate from planning and Building Regulations, and the council does not enforce it. It applies in three main situations:
- Work to an existing party wall. Examples are cutting into it to support a beam, raising or underpinning it, or removing a chimney breast attached to it.
- Building a new wall on or astride the boundary line.
- Excavating close to a neighbouring building. This means within 3 metres of it and deeper than its foundations, or within 6 metres where the excavation would cut a line drawn down at 45 degrees from the bottom of its foundations.
You must give your neighbour written notice:
- at least two months before work to a party wall;
- at least one month before building a new boundary wall or excavating.
Your neighbour can agree in writing. If they dissent, or don’t reply within 14 days, a dispute is treated as having arisen. Surveyors are then appointed to agree a party wall award setting out how the work will be done, and the person doing the work normally pays the surveyors’ costs.
Minor work such as fixing shelves, rewiring or re-plastering does not usually need notice.
Build the notice periods into your programme. GOV.UK has an introduction to party walls and building work and the government’s explanatory booklet on the Act.
Listed buildings and conservation areas
Listed buildings
You can check whether a property is listed on Historic England’s National Heritage List for England.
Listing covers the whole building, inside and out, and can extend to attached structures and some structures within its grounds. Features not mentioned in the list description are still protected.
Listed building consent is needed for any work that affects the building’s character as a building of special architectural or historic interest. That includes many internal changes, such as removing walls, fireplaces or original joinery. It is separate from planning permission. Carrying out unauthorised works to a listed building is a criminal offence, and the owner can be required to reverse them.
Speak to the council’s conservation officer early, and use people who understand traditional construction and materials. Building Regulations still apply. Building Control can take the building’s historic character into account, particularly for energy efficiency upgrades.
Conservation areas
Chichester city centre and many surrounding villages are conservation areas, as are parts of many Hampshire towns and villages. In a conservation area:
- Permitted development rights are reduced, and Article 4 directions often remove more. These can cover replacement windows and doors, for example.
- New work is expected to preserve or enhance the area’s character, so materials and detailing matter more.
- Trees are protected. You must normally give the council six weeks’ notice before cutting down or pruning most trees. Trees with a Tree Preservation Order need consent wherever they are.
Get suitable drawings before asking builders to price
Drawings are not just for the council. They are how you, the planners, Building Control, the engineer and the builder all understand the same project. A project typically needs some or all of the following:
- A measured survey and existing drawings: an accurate record of the current plans and elevations, which everything else is based on.
- Design options or a feasibility study: sketch layouts to test the brief against the budget, the site and the planning position.
- Planning drawings: location and site plans, existing and proposed floor plans and elevations, and sometimes sections and roof plans.
- Building Regulations or construction drawings: how it will be built, including foundations, wall, floor and roof construction, insulation, structural details from the engineer, drainage, ventilation and fire safety.
- A specification or schedule of works: exactly what is included, such as who supplies the kitchen, whether decoration is in the price, and what standard of finishes is expected.
Getting quotations you can compare
- Give every builder the same information: the same drawings, specification and schedule of works. Otherwise you are comparing different jobs, not different prices.
- Approach builders at the right time. An early ballpark figure can help test the budget, but firm quotes are best obtained once approvals and construction information are largely in place.
- Check what is excluded. Look at provisional sums, which are allowances for items not yet defined, and anything left out of the price.
- Agree the terms in writing. Ask for references and evidence of insurance, use a written contract, and link stage payments to work completed.
Changing a design on paper costs very little. Changing it once the foundations are in costs a lot more.
Common mistakes to avoid
- Designing before checking the constraints. A scheme drawn up before anyone checked for a conservation area, an Article 4 direction or a condition removing permitted development rights often has to be redrawn.
- Assuming permitted development applies. Previous extensions, estate conditions, designated land and small dimensional details can all rule it out.
- Treating planning approval as Building Regulations approval, or the other way round. Most extensions need Building Regulations approval even when they are permitted development.
- Asking builders to quote from too little information. The lowest price is often the one with the most left out.
- Finding drainage or structural problems after the design is settled, such as a public sewer under the footprint or a wall that turns out to be load-bearing.
- Ignoring how the extension meets the existing house: blocked air bricks, a bridged damp-proof course, awkward roof junctions or mismatched floor levels.
- Concentrating on floor area rather than layout. A bigger house is not always a better one.
- Starting work too early. Wait until approvals are in place, pre-commencement conditions have been dealt with, party wall notices have run their course and any build-over approval has been granted.
- Under-budgeting. Leaving out fees, fitting out, VAT or a contingency.
- Losing the paperwork. You will need approvals, completion certificates and guarantees when you sell.
Before you start: a checklist
- Decide what the project needs to achieve, and what is only nice to have
- Set a realistic overall budget, including fees, fitting out, VAT and a contingency
- Check the planning position: conservation area, National Park, National Landscape, Article 4 directions and planning history
- Check whether permitted development rights apply to your house, and whether they have been used or removed
- Check the title deeds for restrictive covenants
- Find out whether the property is listed
- Check for protected trees and trees close to where you want to build
- Consider what Building Regulations approval the work will need
- Identify any structural alterations and whether an engineer is needed
- Understand how the existing house is built and whether it has any defects
- Locate the drains and find out whether any are public sewers
- Check the boiler flue, gas meter, heating capacity and electrics
- Confirm the boundaries and talk to your neighbours
- Work out whether the Party Wall Act applies and allow for the notice periods
- Get appropriate drawings, and a specification, prepared
- Get comparable quotations from builders using the same information
- Make sure every approval is in place before work starts
A typical order of events
- Agree the brief and budget.
- Check the planning, legal and site constraints.
- Get a measured survey of the existing house and look at design options.
- Settle the design and apply for planning permission or a Lawful Development Certificate, if needed.
- Prepare construction drawings, with structural calculations, and apply for Building Regulations approval.
- Serve any party wall notices and apply for build-over approval, if needed.
- Obtain and compare quotations, then appoint a builder on a written contract.
- Deal with any pre-commencement planning conditions, then start work.
- Keep the completion certificate and all approvals safe for when you sell.
Smaller projects will skip some of these steps.
This guide reflects the position in England as of November 2026. Planning rules, Building Regulations and fees change, and requirements depend on the individual property and proposal. Check the current official guidance, and confirm with your local council, before relying on it for a particular project.
Where Kenny Relf Surveyors fits in
We are residential surveyors, not designers. Our part is the building you already have: its construction, its condition, and any defects that could affect, or be affected by, the work you are planning.
Steve ran his own construction company before becoming a surveyor and has built, altered and rebuilt houses. We are happy to talk through an idea such as taking down an internal wall or replacing a conservatory with an extension. We can also discuss planning and Building Control applications. If you are buying a house you intend to extend, a Level 3 Building Survey is a good starting point.
How RK Building Design can help
Once you know what you want to achieve and have a sense of the constraints, the next step is usually turning the idea into a workable design and drawings. RK Building Design is Richard Knapp’s building design practice, based in Southampton. It is separate from Kenny Relf Surveyors and has its own contact details.
Its services include:
- Measured surveys and existing drawings of the property.
- Design development and feasibility studies, turning initial ideas into practical proposals, with design options to compare.
- Drawings for planning applications and Lawful Development Certificate applications.
- Construction drawings for Building Regulations approval, incorporating structural engineering details and energy assessments where they are needed.
- Specifications and schedules of works for competitive tender, so builders price the same thing.
- Contract administration and site coordination during construction, where required.
- Drawings for maintenance and remedial works, which can also help with party wall and boundary matters.
Each project starts with a meeting or phone call with Richard about your requirements. He then sends a fee proposal setting out the services needed and the stages of the project.
If you are at the stage of needing drawings for an extension or alteration, you can contact Richard Knapp at RK Building Design using the form below, on 07985 930118 or at captainknapp@hotmail.com. It helps to have a note of what you want to achieve, your budget, and any photos or existing plans of the house.
Contact Richard Knapp at RK Building Design
Your message goes straight to Richard Knapp at RK Building Design, which is a separate business. Kenny Relf Surveyors does not receive a copy.